Key takeaways
- Site work and foundations set the stage and cannot be rushed.
- Framing, roofing and windows make the house weather-tight.
- Mechanical, electrical and plumbing rough-ins happen before insulation and drywall.
- Inspections happen at set points, and each one must pass before the next stage begins.
Site and foundation
The lot is cleared, graded and staked. Utilities are located and trenches dug. Footings are poured, walls built and the foundation waterproofed and backfilled. The inspector checks footings and steel before concrete is poured.
Weather and soil conditions affect this phase more than any other.
Framing and weather-tight shell
Floors, walls and roof structure go up, followed by sheathing, windows, doors and roofing. Once the shell is closed in, work inside can continue regardless of weather.
A framing inspection looks at structure, fastening and fire blocking before anything is covered up.
Systems and insulation
Plumbers, electricians and heating and cooling crews install lines, wiring and ducts inside the walls. Each system is inspected, then insulation goes in, followed by drywall.
This is the right moment to add outlets, lighting or data lines because walls are still open.
Finishes and final inspection
Drywall is hung and finished, trim and cabinets installed, flooring laid, painting completed and fixtures set. Final inspections confirm that the home is ready to occupy.
A walk-through list of small corrections is normal and gets finished before you move in.
Official sites to explore
Brand names and logos belong to their owners. These links open the official websites in a new tab, and we are not affiliated with them.
- Metro Nashville Codes DepartmentPermits and inspections for Davidson County.
- International Code CouncilPublisher of the model building codes used across the country.
- APA The Engineered Wood AssociationGuides on wood framing, sheathing and structural panels.
- ENERGY STARGuidance on efficient homes, windows and equipment.
- U.S. Green Building CouncilInformation on green building and healthy homes.
Quick answers
How long does a custom home take to build?
It depends on size, design, weather and material availability. Your contractor can give a schedule based on your plans.
Can I change things during construction?
Yes, through written change orders. Earlier changes are simpler, before walls are closed.
Who orders materials?
Your contractor orders most materials, while some items such as selected fixtures need your decisions on time.